Monitor Prawniczy
no. 1/2024
Is a public investor jointly and severally liable subcontractors’ indexing claims due to an increase in the prices of materials and implementation costs
DOI: 10.32027/MOP.24.1.5
Autor jest adwokatem (ORA Poznań)
Abstract
The article is an attempt to assess the scope of an investor’s joint and several liability for subcontractors’ claims due to an increase in the prices of materials and project implementation costs. The article analyses the scope of and grounds for such subcontractors’ claims, assesses the current limits of an investor’s joint and several liability for subcontractors’ claims under construction works contracts, and presents pros and contras as regards extending investor’s protection to cover subcontractors’ indexing claims.
Keywords
joint and several liability, price adjustment, price increase, public procurement, claims\b
Literature
M. Balwicka-Szczyrba (red.), A. Sylwestrzak (red.), Kodeks cywilny. Komentarz, Warszawa 2022; M. Fras (red.), M. Habdas (red.), Kodeks cywilny. Komentarz. T. IV. Zobowiązania. Część szczególna (art. 535-764(9), Warszawa 2018; P. Pinior (red.), P. Relidzyński (red.), W. Wyrzykowski (red.), E. Zielińska (red.), M. Żaba (red.), Prawo handlowe. Między teorią, praktyką a orzecznictwem. Księga jubileuszowa dedykowana Profesorowi Januszowi A. Strzępce, Warszawa 2019.